Algerian Journal of Signals and Systems
Auteurs : Azzougui Yasmina . Recioui Abdelmadjid . Mansouri Anfal .
Wide area monitoring system requires the integration of an advanced technology that provides real time synchronized phase angle measurements at all their measurement points. The phasor measurement units are the most advanced devices to achieve that. The objective of this work is first, to find the optimal placement of a minimum number of PMUs in some standardized IEEE systems. Next, the same method was applied to the Algerian 63 bus system. Two cases are taken into consideration: the minimum number of PMUs without considering the ZIB, then, considering the ZIB. The simulations are carried out using MATLAB/SIMULINK.
Smart Grid ; Wide Area Monitoring Systems (WAMS) ; Phasor measurement unit (PMU) ; optimal PMU placement (OPP) ; Grey-Wolf optimization